A resin driveway is becoming one of the most popular driveway choices for front and back gardens. The installation day may seem long but once we have completed the installation you will see the benefits of having a clean, tidy and durable surface.
Site Preparation and Excavation
They will start by clearing your drive of any old surfaces, which can be a noisy process. They will also bring in a skip or possibly use wheelbarrows to remove the old surface and the spoil from the new sub-base. Ensure that no vehicles are left on the drive before they start and ideally clear the drive of any other items as well.
Sub-Base Inspection and Laying
A good sub-base is critical to a driveway lasting well. Your resin driveway installer will likely check your existing base or lay a new compacted MOT Type 1 sub-base approximately 100mm deep.
Resin Mixing and Spreading
As the resin is mixed on site, it is quickly spread over the prepared driveway and left to set. As the installation is taking place, there will be strong fumes emitted by the resin so it is best to keep all windows and doors closed. Children and pets should be kept indoors until the installation is complete. A permeable aggregate blend is a common choice for Resin Driveways Cheltenham and as water can easily drain through the resin driveway, it usually falls within the permitted development for driveways.
There is more on Resin Driveways Cheltenham at https://ecoproresin.co.uk/resin-driveways-surfacing/cheltenham/.
Curing Time
Your new resin driveway can typically be walked upon within 4-6 hours. However, we recommend avoiding use by vehicles for 24 hours or even 48 hours where possible. Some resin products can be affected by cold or damp weather, and therefore curing times can vary depending on the weather conditions.
The First 48 to 72 Hours
Remember to avoid dragging sharp objects across the surface of your Resin Driveway and attempt to keep water away from the edges of the driveway to prevent water from pooling and potential damage. You can start to sweep the drive after 72 hours, but make sure to wait at least a week before jet washing.
Protecting your new resin driveway surface from the off is key. And with a little preparation beforehand, the installation day is soon over and you can start to enjoy your new surface.